Hello all,
The Nova Open 2013 may be over but it's not going to be forgotten any time soon! WOW what an event!
It's time for the yearly picture fest from the event. I think the best way to do this will be day to day starting with August 28 or "NOVA Move in day" So lets get started. This year we needed two "big honking" moving trucks to get everything to the hotel.
Loading time
Recognize anything? |
Overflow |
Overflow |
Loading truck #1 |
Will it all fit? |
Truck 1 Ready to roll! |
Truck #2 heading out of the storage facility |
More of truck #2 |
The Hotel
Valet Parking |
The Front Door |
The lower level |
Capital pallet cases |
Unpacking and prepping
Unloading truck #2 |
The massive service elevator |
Getting the 40K room ready |
The Tables are ready for terrain |
This is not a legit Nova configuration! |
The boss making sure everything is perfect |
More of the Boss at work |
The main staging area |
one of our newer pieces |
Remember this blast from the past |
one of our few water feature like objects |
The service elevator door |
More stuff heading up |
A better arrangement of Nova terrain |
The tables are ready! |
Day one ran pretty smooth but was really long. Next time I will cover Thursday where everything came together.
Till then, later...
RGH
Kudos bob! Another great event. I had so much fun. Maybe we should setup a NOVA painters club for those of us in the area who want to spend weekends painting. Just a thought.
ReplyDeleteI had a blast, and that looks like a ton of work, so thank you!
ReplyDeleteJohn- I like the idea. any thoughts on how to make it work?
ReplyDeleteEvan and John- Thanks for the Kudos. I plan to have day 2 up tonight.